16939
Parameters:
Definitions:
Reactions:
Remedy:
Program Continuation:
Channel %1 action %2<ALNX> rejected due to active gear change
%1 = Channel ID
%2 = Action number/action name
Reorganization events that are possible in Stop state, e.g mode change, are waiting for the end of the gear change. However, the maximum waiting period has elapsed.
- Interface signals are set.
- Alarm display.
Repeat action or increase MD GEAR_CHANGE_WAIT_TIME.
Clear alarm with the Delete key or NC START.
1-863
© Siemens AG 2005 All Rights Reserved